Legislation Details

File #: 6680    Version: 1 Name: Woodlake Lake & Josey Ranch Lake Dam Condition Assessment Study - Walter P. Moore and Associates, Inc.
Type: Resolution Status: Passed
File created: 5/14/2024 In control: City Council
On agenda: 5/21/2024 Final action: 5/21/2024
Title: Consider A Resolution Authorizing The City Manager To Negotiate And Execute A Professional Services Contract With Walter P. Moore And Associates, Inc. For Engineering Services Related To The Woodlake Lake And Josey Ranch Lake Dam Condition Assessment Study In An Amount Not Exceed $121,300.00.
Attachments: 1. Resolution, 2. Location Maps
CC MEETING: May 21, 2024

DATE: May 14, 2024

TO: Erin Rinehart, City Manager

FROM: Jonathan Wheat, P.E., Director of Engineering
Marc Guy, Assistant City Manager

Title
Consider A Resolution Authorizing The City Manager To Negotiate And Execute A Professional Services Contract With Walter P. Moore And Associates, Inc. For Engineering Services Related To The Woodlake Lake And Josey Ranch Lake Dam Condition Assessment Study In An Amount Not Exceed $121,300.00.

Body
BACKGROUND:
The City has two major dams that are City-owned and operated: Woodlake Lake Dam and Josey Ranch Lake Dam. Both dams are inspected by City staff and the Texas Commission on Environmental Quality (TCEQ) on a yearly basis. In 2022, the Woodlake Lake Dam was inspected by TCEQ and received a "poor" rating from the agency, with a list of mitigating efforts needed to bring the dam up to a "fair" condition. The City performed those efforts, and the dam has since been upgraded to a "fair" condition. However, the dam is over 60 years old and is reaching the limit of its original design lifespan. In its current condition, continual maintenance efforts will be needed to keep the dam serviceable and safe for residents.

Josey Ranch Lake Dam, while currently in a "fair" condition with no major issues, is over 20 years old, and the last major maintenance efforts and condition assessment of the dam were performed in 2009. It will also need an updated condition assessment to review any areas that require repair or maintenance.

Walter P. Moore and Associates, Inc. was selected to provide a proposal to perform a condition assessment on both dams. Walter P. Moore has reviewed both dams and has prepared a proposal to perform a detailed condition assessment and outline future maintenance/CIP projects necessary to extend the lifespan and serviceability of both dams.

FINANCIAL IMPLICATIONS:
Walter P. Moore and Associates, Inc. was selected by the Engineering Department to perform a detailed cond...

Click here for full text