CC MEETING: August 20, 2024
DATE: August 12, 2024
TO: Erin Rinehart, City Manager
FROM: Jonathan Wheat, P.E., Director of Engineering
Krystle Boise, Director of Strategic Services
Title
Consider A Resolution Authorizing The City Manager To Negotiate And Execute A Professional Services Contract With Lockwood, Andrews And Newman, Inc., For Engineering Services Related To Design The Hutton Branch - I35 To West Belt Line Erosion Repair Project In An Amount Not To Exceed $362,363.00.
Body
BACKGROUND:
The City of Carrollton Engineering Department identified Hutton Branch from I35 to West Belt Line Road as an area needing major improvements due to on-going erosion issues. There is accelerating erosion to the abutment and the channel slope underneath the W Belt Line Road bridge which, if left unaddressed, may affect the structural stability of the bridge. In addition, W Belt Line Road has multiple abandoned utility lines located beneath the bridge stretching across Hutton Branch. Due to erosion of the channel and the concrete support for the utility lines there is a high probability of the existing abandoned utility lines collapsing into Hutton Branch.
As one of the City's preferred engineering consultants, Lockwood, Andrews and Newman, Inc. (LAN) was selected to design a solution to alleviate the erosive conditions in this drainage corridor. This design would include determination and removal of the existing abandoned utilities located below W Belt Line Road. The design would prioritize the restoration and protection of the abutments for the W Belt Line Road bridge.
LAN has conducted multiple site visits to Hutton Branch and the W Belt Line Bridge to ascertain the full scope of the erosion caused by flooding. LAN has prepared a proposal to create engineering plans and offer bidding and construction services throughout the duration of the project.
FINANCIAL IMPLICATIONS:
LAN was selected by the Engineering Department to develop the engineering plans for erosi...