File #: 3189    Version: 1 Name: Downtown Drainage Improvemnents
Type: Resolution Status: Passed
File created: 3/20/2017 In control: City Council
On agenda: 4/4/2017 Final action: 4/4/2017
Title: Consider A Resolution Authorizing The City Manager To Enter Into A Local Project Advance Funding Agreement With The Texas Department Of Transportation To Construct A Drainage Culvert Under The IH-35E Northbound Frontage Road At Vandergriff Drive In The Amount Of $441,873.25; And Providing An Effective Date.
Attachments: 1. Resolution, 2. Location Map, 3. CDA - City of Carrollton - 0196-03-240 - IH 35E-Culvert 1H-Van H Prkng o...
CC MEETING: April 4, 2017

DATE: March 20, 2017

TO: Erin Rinehart, City Manager

FROM: Cesar J. Molina, Jr., P.E., Director of Engineering

Title
Consider A Resolution Authorizing The City Manager To Enter Into A Local Project Advance Funding Agreement With The Texas Department Of Transportation To Construct A Drainage Culvert Under The IH-35E Northbound Frontage Road At Vandergriff Drive In The Amount Of $441,873.25; And Providing An Effective Date.

Body
BACKGROUND:
In July 2014, City Council authorized the design contract for Downtown box culverts from just east of Broadway on Vandergriff to IH-35E. This was a continuation of the drainage system installed as part of the Union Square project and replacement of an old, undersized box culvert. A change order for $17,800 was authorized by Council in September, 2015 to address additional subsurface exploration to locate franchise utility lines on Vandergriff and add sidewalk along Broadway between Vandergriff and 5th Street.

Initially, staff assumed that the construction of the Vandergriff section of the box culverts would coincide with the construction of the IH-35E section with which it connects. As the construction phasing of IH-35E became more clear and defined, it became apparent that access to the Downtown area will be restricted with Belt Line Road, the IH-35E frontage road and Vandergriff (which impacts Elm Street and Broadway). By delaying the construction of the drainage structures on Vandergriff, mobility is improved in the Downtown area by providing reasonable routes around the IH-35E/Belt Line construction activities. A second change order dated May, 2016 for $56,430.00 authorized the consultant to proceed with design changes to allow the de-coupling of the TxDOT portion of the drainage improvements with the City's Vandergriff project.

A number of modifications are required to accommodate the delay of the Vandergriff project. These include construction of the box culverts a distance up Vandergri...

Click here for full text