File #: 3020    Version: 1 Name: Palo Alto Park Street Reconstruciton, Phase 2
Type: Status: Passed
File created: 11/28/2016 In control: City Council
On agenda: 12/6/2016 Final action: 12/6/2016
Title: Consider Authorizing The City Manager To Approve A Professional Services Contract With Garver, Inc. For Design Services For The Palo Alto Park NOTICE Street Reconstruction Project, Phase 2, And For Alley Reconstruction As Part Of The 2016 Alley Replacement Program, In An Amount Not To Exceed $205,143.00.
Attachments: 1. Palo Alto - Location Map, 2. Alley Replacements 2016-1 Location Map, 3. Supplemental Information Professional Service Contract
CC MEETING: December 6, 2016

DATE: November 28, 2016

TO: Leonard Martin, City Manager

FROM: Cesar J. Molina, Jr., P.E., Director of Engineering

Title
Consider Authorizing The City Manager To Approve A Professional Services Contract With Garver, Inc. For Design Services For The Palo Alto Park NOTICE Street Reconstruction Project, Phase 2, And For Alley Reconstruction As Part Of The 2016 Alley Replacement Program, In An Amount Not To Exceed $205,143.00.

Body
BACKGROUND:
This design services contract is for the second phase of the Palo Alto Park NOTICE project. It will provide the construction plans for the reconstruction of four streets in Palo Alto Park, including Palo Alto, William, Kathy and Jeannette Way. The street reconstructions will include replacing approximately 3,700 linear feet of existing street pavement and sidewalks along with water and sewer lines on each street. The construction cost for this project is estimated at $3,100,000. This project was part of the 2013 Bond Election.
This contract will also provide for the design of the reconstruction of 12 alleys totaling about 1.9 miles as part of the 2016 Alley Replacement Program, including: Ranchview #2 (Kimberly to Ranchview #1), Luallen #1 (Raleigh to Brighton), St. James (Standridge to 660'), St. James (Standridge to Delaford), Delaford #3 (Delaford to St. James), Delaford #5 (Delaford Ct. to St. James), Brighton (Delaford to Standridge), Mayflower (Standridge to Delaford), Peters Colony #3 (Delaford to Standridge), Cutler Place (Peters Colony to Peters Colony #3), Delaford #6 (Peters Colony #3 to Peters Colony) and Chamberlain #3 (Cemetery Hill to Josey). Funding for the design and construction will be performed with the bond funding plus surplus funding approved by City Council on November 15, 2016.
Consultant selection was performed using a Request for Qualifications (RFQ) method whereby engineering firms submitted a two-part Statement of Qualifications which was evaluated by a four perso...